Leopard Yuxin Town Lot C Land Project

Project Name: Wuhan Optics Valley Construction Investment Co., Ltd. Leopard Yuxin Town Lot C Land Project (2011-2012, total project investment is unknown)
Region: Hubei Progress Stage: Environmental Impact Assessment Construction Period: 2011-2012 Major equipment: cranes, fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, and lighting facilities.
Brief introduction of the project: The project is located in the south of Gaoxin 3rd Road, Donghu New Technology Development Zone, East of Guanggu Qilu Road, Leopard Xinxin Town C. The project is a relocation and resettlement housing project with a total land area of ​​557,274.82 square meters. The total construction area is 1,081,743 square meters, the green space rate is 35.0%, the building density is 12.7%, and the total number of households is 11,417. It is planned to build 83 18-28-storey residential buildings, a 3-story 9-class kindergarten and a 3-storey supermarket. And vegetable market, the nature of the site for residential land. The total project investment is unknown.

Construction Unit: Wuhan Optics Valley Construction Investment Co., Ltd. Postal address: Building 5, Contemporary International Garden Office Building, No.110 Guanggu Avenue, Wuhan, China Post code: 430000
Contact: Chen Gong Telephone

Design Unit: Hubei Junbang Environmental Technology Co., Ltd. (EIA)
Postal address: A501, Xingcheng Building, No. 176 Development Avenue, Wuhan, Hubei Province
Zip Code: 430000
Contact: Guo Gong Phone

Related Developments: Tower Crane Infrastructure Project

Activated Carbon Regeneration Rotary Furnace

In 1985, China National Gold Group Corporation was approved by theNational Economic Council,it decided

to introduce foreign advanced technology and equipment to conduct a technological reformation in Tongguan and Zhangjiakou gold mine. United States daiweimaiji company was responsible for the basic design, Changchun Gold Research Institute provided the technical support , introduced the first set electric-heated rotary kiln Activated Carbon Regeneration furnaces of gold industry in China.

In May of 1987 ,it was put into operation, and also has carried on the digestion of technology and domestic equipment reservation.In 2002 , we started to develop JHR-O series fuel oil heated active carbon regenerating furnace, August of 2004, it was put into practice in Zhang jiakou Gold mine of Hebei.In 1997 ,we also developed the JHR series electric heated active carbon regenerating furnace,in 2007, technology was upgraded and we also applied for patent of electrical ( gas ) heating rotary kiln for activated carbon regeneration equipments, gas prices rose dramatically in 2010, JHR-E series electric heating rotary kiln for active carbon regenerating furnace became the main force again.

Activated Carbon Regeneration Rotary Furnace,Rotary Kiln Furnace,Small Rotary Kiln,Electric Rotary Kiln

Changchun Gold Research Institute Co.LTD , https://www.changchungoldresearch.com

This entry was posted in on