Model NO.: Y121
Runner: Hot Runner
Design Software: AutoCAD
Installation: Fixed
Certification: TS16949, ISO
Standard: DME
Customized: Customized
Trademark: Mimo
Transport Package: Carton
Specification: PC
Origin: China
HS Code: 8480719090
Model NO.: Y121
Runner: Hot Runner
Design Software: AutoCAD
Installation: Fixed
Certification: TS16949, ISO
Standard: DME
Customized: Customized
Trademark: Mimo
Transport Package: Carton
Specification: PC
Origin: China
HS Code: 8480719090
 1,Currency:   RMB    USD     JPY                   | |||||||
2,Payment of Tooling: 50% prepayment,the rest should be paid in 10 days after the sample approval. | |||||||
3,Mold Development and Sample Delivery: After both sides confirm 2D and 3D drawings and  prepayment, the mold manufacturing cycle is normally 14 days,  samples manufacturing cycle is normally 14 work days. | |||||||
4,Tooling lifetime:200K times | |||||||
5,Free Sample Qty:30 pcs | |||||||
6,Production Cycle:Once the order is placed, we will ship products in several batches.( Freight is on us) | |||||||
7,Payment:Payment collected within 105 days after invoicing.  | |||||||
8,Minimum Order Quantity :10K pcs (The offer is invalid if the quantity is less than MOD.) | |||||||
9,Validity of Quotation: 60 Days | |||||||
10,1)Before the mold openning,both sides must comfirm 2D and 3D drawings         2) This offer is based on the existing drawing.If future products requirement contain material changes  in dimension,material, and productiong procedure, the quotation must be revalued. |
Plastic Injection Machine
 Die-Casting Machine
 Sintering Furnace
MIMO spread over 13000 square meters, including office area and workshop. The office area houses our capability of engineering management, product design, and project management. Our workshop houses our capability of manufacturing process, including tooling, debinding, batch vacuum, continuous sintering capability and secondary processing.
 Â
1,Currency:Â Â Â RMBÂ Â Â Â USDÂ Â Â Â Â JPYÂ Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â | |||||||
2,Payment of Tooling: 50% prepayment,the rest should be paid in 10 days after the sample approval. | |||||||
3,Mold Development and Sample Delivery: After both sides confirm 2D and 3D drawings and  prepayment, the mold manufacturing cycle is normally 14 days,  samples manufacturing cycle is normally 14 work days. | |||||||
4,Tooling lifetime:200K times | |||||||
5,Free Sample Qty:30 pcs | |||||||
6,Production Cycle:Once the order is placed, we will ship products in several batches.( Freight is on us) | |||||||
7,Payment:Payment collected within 105 days after invoicing.  | |||||||
8,Minimum Order Quantity :10K pcs (The offer is invalid if the quantity is less than MOD.) | |||||||
9,Validity of Quotation: 60 Days | |||||||
10,1)Before the mold openning,both sides must comfirm 2D and 3D drawings         2) This offer is based on the existing drawing.If future products requirement contain material changes  in dimension,material, and productiong procedure, the quotation must be revalued. |
Plastic Injection Machine
 Die-Casting Machine
 Sintering Furnace
MIMO spread over 13000 square meters, including office area and workshop. The office area houses our capability of engineering management, product design, and project management. Our workshop houses our capability of manufacturing process, including tooling, debinding, batch vacuum, continuous sintering capability and secondary processing.
Â
Centrifugal concentrator is known as centrifuge or centrifugal chute. Strong centrifugal force produced by high speed spin strengthens the process of gravity separation and effectively recover the ultrafine ore particles. Nowadays, centrifugal concentrator is widely used for the recovery of gold, tungsten, lead, manganese, iron, etc.
Gold Centrifugal Concentrator,Gold Gravity Concentrator,Gold Centrifuge Machine,Gold Centrifugal Concentrator Separator
henan ascend machinery , https://www.ascendminingmachinery.com