The purchase of the shore bridge is 64 metric tons of spreader, lifting height of 38 meters, forward reach of 47 meters, is the first time DBGT company to purchase from the company.
The management of DBGT said that the company's ZPMC port machine is the most cost-effective in the world, so he chose ZPMC without hesitation in purchasing options.
The Port of Tuticorin is located at the southernmost tip of the Indian Peninsula. In order to better serve South Asian customers and customers in southern India, Tuticorin Port will further enhance container handling capacity in scientific planning. The cooperation between the two sides has laid a solid foundation for broader cooperation in the future.
The function for SINOFUJI Overhead Line Cover is to shorten the safety distance, increase the creepage distance, prevent bird damage, prevent wind deflection, prevent air floating objects and various plants from being collided or contacted, it can be eliminated electromagnetic radiation (induction) Impact on people and animals who are nearby the overhead line.
Being equipped with special installation tools with the principle is similar to that of clothe zipper, it can be installed without shut down the power (the voltage is 10kV or below). The operator can install up to 80 meters of overhead line by standing on one fixed position, the installation speed can be reached as high as 20 meters/5 minutes if two people working together in a team.
Overhead Line Cover Sleeve,High Voltage Power Line Cover,Insulated Line Protection Cover,Silicone Rubber Overhead Line Cover
ShenZhen FUJI Electric Material Co., Ltd , https://www.sinofuji.com