According to the analogy analysis of the top plate of the surface, the initial pressure step is 15~30 meters.
1. The company set up a preliminary team for the initial release, and the overall team is responsible for coordinating the work and release of the work. According to the “good equipment standardâ€, all the electromechanical equipments on the working surface will be inspected one by one to ensure that all electromechanical equipments are well lubricated, the oil level and pressure are normal, the protection devices are complete and reliable, and the wiring meets the standards to prevent explosion. Starting from the initial release and preliminary release, the progress of the initial release of the safety work on duty should be recorded in detail, and the dispatching room or the team leader of the initial mining and preliminary release team should be reported in time.
2. After the installation and acceptance of the working face, the leading group of the initial mining and preliminary release is responsible for the single-machine test operation of all the equipment on the working surface, and debugging. When the single machine is running normally, the joint test operation is carried out in the order from the outside to the inside to ensure the joint test operation. The equipment is operating normally during the initial mining.
3. When the roof of the tail beam of the bracket is fallen, the coal can be discharged from the bottom to the top. The amount of the coal is not more than 30% of the total amount of the top coal. As the work advances forward, the amount of top coal is gradually increased.
4. The working face is pressed, the direct top is behind, the top coal is released, and the filling height is guaranteed. The roof is bent, sunken and broken, that is, the working face begins to pressure. Normal coal mining, during the initial mining of the working face, the top coal outflow rate in the range of 20m reaches 50%.
5. During the lottery period, in accordance with the provisions of the “Operation Regulationsâ€, the stope is set up, and the end and two advanced support are strengthened. The pillars are intact, the boots are worn, and the stigma is tied reliably.
6. Strictly move the frame according to the cycle schedule, support the roof in time, and minimize the empty top area and the end face distance.
7. When the work surface appears to suppress the warning, strengthen the follow-up inspection, strengthen the support, report and record in time to pressure the situation.
8. During the initial mining period, the equipment maintenance is strengthened. The emulsification pump and hydraulic system are intact and no sputum sputum. The pump station pressure reaches 30Mpa and the emulsion concentration reaches 3~5%.
9. When the working face is pressed, try to speed up the advancement until the first pressure is applied.
10. If the working face is opened and cut, if the top coal is still not falling, it is necessary to force the top until the top plate is completely fallen.
11. When the working surface cycle is before and during the pressure, strengthen the working surface and the management of the two roofs, and strictly prevent the front and rear scraper conveyors from being crushed and the front scraper.
12. Strengthen the upper and lower end support during the initial mining and initial release to ensure unimpeded flow, and the pedestrian width is not less than 0.7m.
13. Reserve a sufficient amount of support material for the two lanes during the initial mining and preliminary release to support the pressure.
14. During the initial mining of the working face, the two advance support distances shall not be less than 40 meters to strengthen the support.
15. Two pedestrians in the working face, unobstructed ventilation, and reserve the grease, wearing parts maintenance tools and spare materials needed for the shift at the designated place. The ventilation, dustproof, fireproof and gas-proof facilities of the fully mechanized caving face must be complete. And in line with the "Safety Regulations for Coal Mines" and related documents.
16. During the initial mining period, if the pressure does not appear to be very severe, the working surface advancement should be slowed down, and the bracket should be lifted repeatedly so that the top coal can be broken early.
17. According to the above method, only when the leading group or technicians are on-site to identify and determine the initial release of the initial mining, all the processes on the working surface can be carried out normally according to the “Operation Regulationsâ€.
18. During the initial mining period, strictly follow the production process stipulated in the “Operation Regulationsâ€. When coal is cut, if the coal wall pressure is high, there is a roof. When the film is waiting for the omen, the front bracket must be pulled out in time to extend the front beam and the guard plate. Pedestrians are strictly prohibited near the coal wall.
19. All brackets on the working surface must ensure sufficient initial support.
20. During the initial mining period, strictly control the quality of the working surface. When using the laser pointer or the working surface, ensure that the brackets are straight and straight. At the same time, pay attention to adjust the spacing of the brackets to prevent the occurrence of backing and biting.
21. The working face shall check the gas concentration during the initial mining and work recovery period no less than 2 times per shift.
YRS type use glass wool as sound-proof material.
A Ventilation Duct Silencer is a component of Ventilation system used to reduce noise transmitted inside ventilation ductwork. Duct silencers are also referred to as sound attenuators, sound traps or mufflers.
1,the use of raw materials are Stainless Steel Duct and galvanized steel;
2, strong noise reduction effect, reduce energy consumption, save operating costs, high strength, good sealing performance, beautiful appearance, simple installation, long service life;
3,Used for air supply, exhaust and smoke exhaust pipes of ships, shopping malls, office buildings, subway, civil air defense, basement and other projects.
4, its thickness and specifications can be changed according to requirement.
Ventilation Duct Silencer,Exhaust Pipe And Silencer,Ventilation Duct Silencer Kitchen,Inline Duct Silencer
YANTAI DONGTAI STANDER OFFSHORE ENGINEERING CO.,LTD , https://www.dongtaicolumbus.com