(1) check the boom cylinder leakage situation. The easiest way is to raise the boom to see if there is a clear free fall. If the whereabouts of obvious removal of fuel tank inspection, seals have been worn should be replaced.
(2) check the control valve. First clean the safety valve , check whether the spool wear, such as wear and tear should be replaced. If the safety valve is still installed after the change, and then check the control valve spool wear, the use of the gap is generally limited, serious wear and tear should be replaced.
(3) measure the pressure of the hydraulic pump. If the pressure is low, then make adjustments, the pressure is still not adjustable, the serious damage to the hydraulic pump.
Pipe fabrication is the process of welding piping components such as pipes, elbows, tees, flanges, etc., into engineered piping systems in exact accordance with our customers' design requirements.The pipe fitting fusion machine fuses HDPE / poly / polyethylene pipe at angles to for fittings including bends, tees, wyes (Y) and flange necks ; short flange necks can be welded with the help of a stub end holder (optional), applied to the clamps. For HDPE fitting fusing and fabrication, Wuxi Yuda Plastic Welding Machinery Factory offers a complete of hdpe fitting welding equipment and plastic pipe cutting machines from 40-2600mm. You can choose RGH series Semi-Automatic HDPE fitting fusion machines, RGH-JL series Data-logging plastic pe fitting fabrication welding machine and RGH-A series CNC pipe fabrication welding machine for hdpe /poly/polyethylene pipes
Fitting Fabrication Machine,Fitting Welding Machine,Fitting Fabrication,Hdpe Fusion Fittings
WUXI MEIERTE MACHINERY TECHNOLOGY CO.,LTD , https://www.pipefusionweldings.com