I. Technical documents for the preparatory stage
1. Start report
2, the design of the bottom, the drawing will be reviewed
3, technology (security) record
Quality Management Information (2)
I. Unit project quality assessment data
1. Project quality supervision report
2, unit project quality level construction unit self-assessment record
(1) Unit project quality comprehensive assessment form
(2) coal mine roadway unit project quality assurance inspection rating information table
(3) Unit project perception quality assessment form
(4) Summary of quality assessment of divisional projects
Second, the unit project completion quality acceptance data
1. Unit project completion report
2. Unit project completion acceptance certificate
Third, engineering measurement records
1. Engineering positioning measurement and retest record
2. Engineering construction measurement record
Fourth, various notifications, records and quality processing results
1. Construction (supervision) unit notification, order, identification record, report and processing data
2. Various notifications, treatment measures and processing results of the steel quality supervision station
Quality assurance information
First, the steel factory certificate
1. Steel factory certificate
2, steel mechanics test report
3. Steel chemical test report
Second, welding test (inspection) inspection report, welding rod (agent) certificate
1, welding rod (agent) certificate
2, welding test (inspection) verification
Third, the cement factory certificate or test report
1. Cement factory certificate or factory test report
2. Cement test report
Fourth, other raw materials factory certificate or test report
1. Sand test report
2, broken (egg) stone test report
3, admixture factory certificate
4. Admixture test report
V. Waterproof material factory certificate, test report
1. Water quality material factory quality certification document
2, waterproof material test report
Sixth, the component certificate
1. Prefabricated reinforced concrete component factory certificate
2, prefabricated structural performance test record
3, steel rod factory certificate
VII, test block test report
1. Test report of mechanical test of ç ¼ test block
2, anti-seepage test report
3, the product ç ¼ factory certificate
4, ç ¼ test strength statistical evaluation table
5, spray ç ¼ strength test record
(1) Point-to-use test method for detecting jet enthalpy strength
(2) Extraction method to detect the jet enthalpy intensity record
Eight, mortar test block test report
1. Mechanical test report of mortar test block
2, mortar test block strength statistical evaluation table
Nine, concealed engineering inspection and acceptance records
Concealed engineering inspection acceptance record
X. Construction organization design, operation procedures, technical measures
Construction organization design, operation procedures, technical measures
XI, ç ¼ water PH value test list
ç ¼Water pH test form
Twelve, mortar and mortar mix ratio notice
1, ç ¼ match ratio notice
2, mortar mix ratio notice
Thirteen, anchor rod, anchoring agent factory certificate, anti-drawing force test record
1. Anchor rod anchoring agent certificate
2, the anchor rod body factory certificate
3, anchor pull-out force detection record
Fourteen, wellbore leakage data measured data
Wellbore leakage measurement record
Fifteen, construction record, quality self-inspection, intermediate inspection quality inspection record
1. Construction and quality self-test records
2. Divisional engineering quality inspection and assessment form
3. Sub-item quality inspection and evaluation form
XVI. Major engineering quality accidents and handling records
1. Project quality accident report
2, engineering quality accident handling records
Seventeen, the basic map of the measured equipment
Measured equipment basic diagram
18. Geological and hydrogeological data
1. Check the drilling geological report
2. Geological prediction and comprehensive analysis report
3. Main roadway, diverticulum geological section, sketch drawing or wellbore measured histogram
Nineteen, design documents, as-built drawings
1. Construction drawing
2, design change notice
3, as-built drawings
Couplings are used to connect two joints of TUBING COUPLING or CASING pipe together.
Couplings are short length of heavy wall pipe with the same threads on each end.
EASTSUN manufactures TUBING coupling and casing tubing coupling strictly comply with API 5CT latest standard.
The steel coupling is mainly used to connect oil pipes in pil drilling.
This product can be used to connect the shafts of units that are
manufactured separately.
It can fit the misalignment of the shafts or introduce mechanical flexibility.
The pipe coupling is capable of reducing the transmission of shock losds from one shaft to another.
It can also introduce protecyion against overloads.
The steel coupling can be used to alter vibration characteristics of
rotating units.
Pipe coupling is also used to connect drilling par and driven part.
Size | Grade | NUE | EUE | Special clearance |
2 3/8" | J55/K55/M80/L80/P110 | Yes | Yes | Yes |
2 7/8" | J55/K55/M80/L80/P110 | Yes | Yes | Yes |
3 1/2" | J55/K55/M80/L80/P110 | Yes | Yes | Yes |
4" | J55/K55/M80/L80/P110 | Yes | Yes | |
4 1/2" | J55/K55/M80/L80/P110 | Yes | Yes |
Casing Coupling Solution,Api 5Ct Coupling,Casing Coupling,Tubing Coupling
ESASTSUN OILFIELD EQUIPMENT MANUFACTURING (CAMBODIA) CO., LTD , https://www.eastsuncambodia.com